Rottnest Island Standby Power

About This Project

Summary 

This project involved the installation of a new Standby Generator Plant (SGP) at (WA) Rottnest Lighthouse to improve backup AC power reliability for the site. The works included the installation of a new 20kVA generator, automatic transfer switching infrastructure, associated electrical cabling, monitoring systems, and commissioning activities.  

Scope of Work 

  • Generator Installation: Installation of a new 20kVA standby generator with integrated fuel tank and controls.  
  • Electrical Infrastructure: Installation of a new ATS, ATS board, power cabling, alarms, controls, and monitoring systems.  
  • Service Cutovers: Staged power cutovers and temporary power arrangements during installation works.  
  • Structural Works: Minor make-good works, patching, painting, and installation of fire extinguishers.  
  • Testing & Commissioning: Generator testing, commissioning, AMS alarm integration, noise monitoring, and operational verification.  
  • Documentation & Logistics: Freight, craneage, O&M manuals, updated drawings, and project handover. 