End-to-end data centre build and fit-out.

DCE delivers the complete data centre build in-house, from design through to commissioning. 

One contractor. Complete scope. 

Data centre construction is a multi-discipline project. The electrical infrastructure, the mechanical and cooling systems, the structural fit-out, and the building management systems all need to work together as a coherent whole. When those disciplines are split across multiple contractors, coordination becomes a project risk.  

DCE manages all of them in-house, which means the design is integrated from the start and the delivery is managed by one team throughout. 

lightning icon

One integrated project

DCE's data centre work includes the full scope: HV and LV electrical supply, UPS and critical power, precision cooling, raised floor and containment, structural works, and BMS integration through Leopard Controls. Projects are delivered under a single contract with DCE carrying full responsibility for the outcome.

Scope covered

Data centre builder managing electrical infrastructure with power panels and switches lining a modern data centre hallway for reliable operations

Electrical Infrastructure

HV/LV supply, UPS, distribution, critical power the full electrical scope designed and delivered in-house.

Outdoor air conditioning units installed beside a building to support reliable precision cooling systems & temperature control

Mechanical and HVAC

Precision cooling, chilled water, air handling, designed and installed alongside the electrical scope.

Data centre construction with a steel building frame, structural elements and construction equipment on an active site

Structural and Civil

Building works, raised floors, structural fit-out, cable containment, in-house civil capability.

Data centre construction with three computer monitors, keyboard and mouse supporting BMS and EMS systems through Leopard Controls

BMS and EMS

Building and energy management integration via Leopard Controls, a Siemens partner with open protocol capability.

Gnangara Data Centre

End-to-end data centre build and fit-out delivered as a single integrated project, electrical, mechanical, structural, and BMS scopes managed under one contract by DCE. Full project profile available on request. 

30 plus years of continuous delivery at the Perth International Telecommunications Centre.

Latest Insights

Articles, technical guides, and project perspectives.