Summary
This project spanned 16 sites across Western Australia, involving upgrades to DC solar power systems and backup generation. The work prepared each site for future growth by installing and commissioning solar hybrid and cooling solutions to support additional load requirements.
Scope of Work
- Upgrade of DC solar power systems, including ground-mounted panel arrays on fixed-tilt frames.
- Installation and commissioning of backup generators for supply redundancy.
- Integration of solar hybrid arrangements to manage switching between solar and generator supply.
- Installation of critical cooling units to protect equipment enclosures.
- Building and civil works to support equipment housings and mounting structures on-site.
- Site preparation to accommodate future load growth as demand increases.