Archive

Site: PITC - PER502Site Address: 620 Gnangara Road, Cullacabardee WA6067Services: Building work, Critical HVAC, Critical Power Systems, Earth Stations summary DCE Electrical was awarded the PITC Gnangara construction project, managing all aspects entirely in-house without external contractors. The scope included site coordination, antenna foundation and grounding installation,...

Site: Tivendale - OneWeb Project  Site Address: Coffey St, Tivendale NT 0822Consultant: GHDServices: Building Work, Critical HVAC Systems, Critical Power Systems & Earth Stations summary DCE Electrical was awarded the Construction of a Satellite Earth Station Facility Tivendale NT, which consisted of preparing a Greenfield Site in...

Site: Merredin Satellite Earth StationSite Address: Lot 1324 Mackenzie St, MerredinServices: Building Work, Critical HVAC, Critical Power System & Earth Station summary DCE Electrical was selected to construct a new Satellite Earth Station in Merredin WA on a greenfield. The project involved constructing a new 5 x...

Site: WA Solar Network SitesSite Address: 16 Various SitesServices: Building & Civil Work, Critical HVAC, Critical Power Systems summary This project included 16 different sites, which involved upgrades of the DC Solar Power Systems and Backup generators, which ensured that the sites were ready for future growth...

Site: Perth International Communications CentreSite Address: GnangaraServices: Building Work, Critical HVAC, Critical Power System, Data Centre  summary DCE Electrical was selected to carryout extensive electrical and mechanical services upgrade to include the installation of new UPS Distribution switchboards. The mechanical services to the new data centre area...

Site: Pier Street TESite Address: (PIEZ) - 98 PIER STREET, PERTH WA 6000Services: Building Work, Critical HVAC, Critical Power Systems, Data Centre summary The Pier Street TE –Network Project involved the refurbishment of the 4th Floor of the Pier Street Telephone Exchange building to accommodate the installation...

Site: (NT&SA) Top End Ciena Project- Solar Hybrid UpgradeSite Address: 8 Sites across SA to NTServices: Building Work, Off-Grid Solar Hybrid summary 8 Solar Sites (NT/SA) require an extensive upgrade to include a purpose-built ICS concrete shelter which includes the installation of a new power control cabinet,...